Laneways will be resurfaced starting June 13th

Please read the attached letter from the Town of Markham.  The laneways that were resurfaced last fall will be scraped and repaved starting the week of June 13th.  There will be access restrictions during this time and residents affected by the work will be permitted to park on the street in designated areas.  This letter will be mailed to the homes with the laneways where the work will be completed.  The Angus Glen Ratepayers will be dropping off copies of this letter to all homes as well and there will be signs at the turn abouts the week of May 30th.  We thank the Town for their cooperation and for working with the Angus Glen Ratepayers Association and our residents on resolving this issue.

Meg Stokes

Angus Glen[1]


This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Maximum one link per comment. Do not use BBCode.